Our very own custom built pump trailer covers all commissioning and five yearly testing capabilities as required by current Australian Standards.
Hydrant System Commissioning as per AS 2419
Hydrant System 5 yearly maintenance test as per AS 1851 Section 4
Static pressure at booster and flow testing at most hydraulically disadvantaged hydrant.
Boosted simulation testing above 700 kPa for Fire Brigade Operation confirmation.
Hydrostatic fire supply main testing.
Hose reel testing.
Block plans and pressure signage.
All of these items are included in house for our service customers and we can offer this service complete with our pump trailer and licenced operator to fire installation companies and plumbing installers.
Hydrant System Commissioning as per AS 2419
Hydrant System 5 yearly maintenance test as per AS 1851 Section 4
Static pressure at booster and flow testing at most hydraulically disadvantaged hydrant.
Boosted simulation testing above 700 kPa for Fire Brigade Operation confirmation.
Hydrostatic fire supply main testing.
Hose reel testing.
Block plans and pressure signage.
All of these items are included in house for our service customers and we can offer this service complete with our pump trailer and licenced operator to fire installation companies and plumbing installers.